Calgary Film Centre

Calgary, AB

Contract Value:

$21 million

Prime Consultant:

Kasian Architecture Interior Design & Planning Ltd.

Project Owner:

Calgary Film Centre Ltd. - Calgary Economic Development

Contract Format:

General Contract

Completion Date:

April 2016

Contract Duration:

18 months

The Calgary Film Centre is used to film and produce major motion pictures. Phase 1 of the project included the construction of a 37,000-square-foot set/workshop, and Phase 2 consisted of a 70,000-square-foot sound/production studio. The buildings are state-of-the-art and feature architectural pre-cast concrete and steel frame. The Production Studio has 50-foot ceilings (44-foot clear height) and, at the time, the pre-cast panels were the largest the supplier had ever produced.