Boeing 737 MAX Project, Murray Park Facility

Winnipeg, MB

Contract Value:

$42 million

Prime Consultant:

Stantec Architecture Ltd.

Project Owner:

Boeing Canada Operations Ltd.

Contract Format:

CM as Agent

Completion Date:

November 2015

Contract Duration:

31 months

This project involved construction of a 14,437 m2 addition to Boeing’s existing aircraft composite parts manufacturing facility. The expansion includes a clean room (to identify airborne contaminants per volume), and infrastructure support for two additional 16 foot x 45 foot autoclaves. The expanded building, which includes two bays about the size of 12 Olympic-sized swimming pools, allows Boeing to build the complex parts for its newest 737 model in-house.

Graham’s expertise with projects of this level of complexity allowed for multiple value engineering and design innovations. The success of this complex project required Graham to be adaptive and flexible, accommodating the client’s evolving needs.