Industrial

Lloydminster Husky Ethanol Plant

Lloydminster, AB

Contract Value:

NA

Prime Consultant:

KGS Group

Project Owner:

Husky Oil Operations Ltd.

Contract Format:

Engineering, Procurement, Construction, Commissioning (EPCC)

Completion Date:

August 2006

Contract Duration:

NA

Husky contracted Graham to provide engineering, procurement, construction and commissioning services for a new ethanol plant with capacity of 130 million litres per year. This project is located adjacent to the Husky Oil Upgrader at Lloydminster, Saskatchewan.

The basic components of the project include: a grain handling facility and associated material handling systems; a grain milling facility, a fermenter (field-erected tanks), process equipment, distillation and dehydration process systems, an evaporator, centrifuges and dryers for DDGS co-product, a cooling tower, ethanol storage tanks complete with truck and rail load-out systems, and DDGS storage. Engineering included detailed civil, structural, mechanical, electrical and instrumentation design based on a process design provided by the owner.