Eisenhower High School

Yakima, WA

Contract Value:

$80.4 million

Prime Consultant:

NAC Architecture

Project Owner:

Yakima School District #7

Contract Format:

Stipulated Price

Completion Date:

December 2014

Contract Duration:

September 2011-August 2014

Graham’s general contract project of a new 30,909-m2 (332,647-sq. ft.) high school became the largest single building, square foot high school in the state of Washington. The scope of work included the construction of a 2,500-seat capacity gymnasium, an 800-seat auditorium with a fly lift and orchestra pit, science and computer laboratories, and a cafeteria with food services to host a campus of 2,400 students.

The new high school housed all required curriculum in one building including science laboratory classrooms, child daycare center, library, work-out centre, video production, drafting classrooms, and metal and wood shop facilities.