Holy Trinity Catholic High School

Holy Trinity Catholic High School Location: Edmonton, Alberta Holy Trinity High School was originally designed by iconic Canadian Architect, Douglas Cardinal and built in the early 1980’s. Originally designed to be a full circle with an interior courtyard; only half...

CNRL Albian Sands

CNRL Albian Sands Location: Fort McMurray, AB Graham has been performing mechanical maintenance, turnaround, shutdown and sustaining project services for CNRL’s Albian Sands, since 2014. Our scope includes services such as: Specialty welding Tank and vessel...

Ethylene-1 Maintenance Turnaround

Ethylene-1 Maintenance Turnaround Location: Joffre, AB Within a 45-day window, Graham executed complete mechanical, fixed plant maintenance, repair, fabrication, installation, scaffolding and insulation on all Ethylene-1 (E1) plant systems and equipment. Contract...

Frank Wastewater Treatment Plant Upgrades

Frank Wastewater Treatment Plant Upgrades Location: Frank, AB The Frank Wastewater Treatment Plant serves the Crowsnest Pass municipality and discharges treated effluent into the Crowsnest River. To increase the plant’s capacity, the project involved expanding the...

High River Community Resource Centre

High River Community Resource Centre Location: High River, AB This Design-Build project was completed in two phases. Phase 1 comprised a new LEED Gold, mixed-use office building in downtown High River. The new building replaces the previous Provincial Building and the...