Macleod Trail & 162nd Street SE Interchange Location: Calgary, AB Graham joined the broader project team when the design was only 60% complete and suggested several design and efficiency improvements. The result was a uniquely designed interchange at Macleod Trail...
Gilead API Process Tower Location: Edmonton, AB Graham was selected in 2016 to construct a new Active Pharmaceutical Ingredient (API) Process Tower, which will provide Gilead with additional manufacturing capability for investigational drugs for clinical research...
Castle Rock Ridge Wind Power Project Location: Pincher Creek, AB The 76 MW Castle Rock Wind Power Plant consisted of 33 Enercon E-70 (2.3 kW) turbines plus access roads, underground collectors, foundations, and substation construction. The access road scope included...