Bridge Rehabilitation on PTH 8

Bridge Rehabilitation on PTH 8 Location: Winnipeg, MB This project, inclusive of both Southbound and Northbound Overpass structures, required the removal of the top 100 to 150 mm of surface concrete from a 600 mm thick post tensioned bridge deck spanning six lanes of...

Brandt Tenant Building

Brandt Tenant Building Location: Winnipeg, MB This project involved the construction of a pre-engineered building consisting of glass, concrete, and steel, including shipping and receiving docks. The main entrance of the building is constructed from custom curved...

Regional Fire Centre and Initial Attack Base

Regional Fire Centre and Initial Attack Base Location: Lac du Bonnet, MB This project involved the design-build of a 1,672 m2 two-storey concrete pile and slab on grade with a structural steel building, complete with an insulated metal panel, aluminum strip windows,...