Block 23 & Central Park

Block 23 & Central Park Location: Calgary, AB The Block 23 & Central Park project consists of two signature buildings with mixed-use retail and office space and a large, landscaped park. The build consists of a unique five-storey East Building with offices,...

Bower Place Mall Expansion and Renovation

Bower Place Mall Expansion and Renovation Location: Red Deer, AB This project included interior renovations and fit-outs within a portion of Bower Place Mall, while the larger facility remained open to the public, as well as the demolition of the previous Target store...

LRT Crossings Work

LRT Crossings Work Location: Edmonton, AB Graham was awarded the Construction Manager role for upgrades and improvements to LRT Crossings throughout the City of Edmonton as part of a City of Edmonton Call Up portfolio in 2019. The project was originally awarded as two...

Frontier Collegiate Dormitory

Frontier Collegiate Dormitory Location: Winnipeg, MB In this project, it was important that construction be durable and robust, yet still convey a “home away from home” feeling for the students. Utilizing construction materials requiring only minor maintenance (e.g.,...

Club Regent Casino Parkade

Club Regent Casino Parkade Location: Winnipeg, MB The Club Regent Casino parkade is a 5-storey, 900-vehicle pre-cast concrete parking structure with access to the hotel via a structural steel walkway. The parkade includes three electric traction elevators and four...