Costco Rosewood New Store Location: Saskatoon, SK This project was a much anticipated second Costco store for the City of Saskatoon. It comprised of a 14,492 sqm (156,000 sqft) commercial sales, pre-engineered steel warehouse complete with 5-bay tire install, propane...
Husky Ethanol Project Location: Lloydminster, SK Husky contracted Graham to provide engineering, procurement, construction and commissioning services for a new ethanol plant with capacity of 130 million litres per year. The basic components of the project include: a...
Bower Place Mall Expansion and Renovation Location: Red Deer, AB This project included interior renovations and fit-outs within a portion of Bower Place Mall, while the larger facility remained open to the public, as well as the demolition of the previous Target store...
Yellowhead Power Station Location: Near North Battleford, SK Graham was contracted to design, fabricate, supply and install two pre-engineered steel buildings totalling 11,000 sq.ft. The scope also included civil, mechanical, electrical, architectural finishes, and...
Teck Coal Truck Shop Expansion Location: Elkford, BC This project comprised the design and construction of a facility equipped to handle Teck Coal’s 400-ton hauling trucks. Included was the addition of four service bays, two manipulator bays, two wash bays equipped...