Bower Place Mall Expansion and Renovation

Bower Place Mall Expansion and Renovation Location: Red Deer, AB This project included interior renovations and fit-outs within a portion of Bower Place Mall, while the larger facility remained open to the public, as well as the demolition of the previous Target store...

Yellowhead Power Station

Yellowhead Power Station Location: Near North Battleford, SK Graham was contracted to design, fabricate, supply and install two pre-engineered steel buildings totalling 11,000 sq.ft. The scope also included civil, mechanical, electrical, architectural finishes, and...

Teck Coal Truck Shop Expansion

Teck Coal Truck Shop Expansion Location: Elkford, BC This project comprised the design and construction of a facility equipped to handle Teck Coal’s 400-ton hauling trucks. Included was the addition of four service bays, two manipulator bays, two wash bays equipped...

LRT Crossings Work

LRT Crossings Work Location: Edmonton, AB Graham was awarded the Construction Manager role for upgrades and improvements to LRT Crossings throughout the City of Edmonton as part of a City of Edmonton Call Up portfolio in 2019. The project was originally awarded as two...

Frontier Collegiate Dormitory

Frontier Collegiate Dormitory Location: Winnipeg, MB In this project, it was important that construction be durable and robust, yet still convey a “home away from home” feeling for the students. Utilizing construction materials requiring only minor maintenance (e.g.,...