Aquatera Wastewater Treatment Plant Upgrades Phase II

Aquatera Wastewater Treatment Plant Upgrades Phase II Location: Grande Prairie, AB Graham was contracted to upgrade and expand the existing biological liquid treatment and sludge handling processes. This required construction of two new secondary clarifiers and...

Cornwall Wastewater Treatment Plant Upgrades

Cornwall Wastewater Treatment Plant Upgrades Location: Cornwall, ON This project included upgrades to the existing wastewater treatment plant, along with three new buildings: a new sludge thickening building, new screening facility and the newly designed BAF building...

EPCOR Rossdale Water Quality Assurance Laboratory & Offices

EPCOR Rossdale Water Quality Assurance Laboratory & Offices Location: Edmonton, AB This 4,068 m2 facility is situated within EPCOR’s Rossdale Water Treatment Plant, located between the North Saskatchewan River and Edmonton’s downtown core. The building consists of...

Amazon DCG4

Amazon DCG4 Location: Calgary, AB This project consisted of renovations to a 1-year-old warehouse, as well as the subsequent fit out of the facility into a distribution centre. The scope included demolition, the construction of new offices, the installation of 10 new...

Alberta Children’s Hospital Lot 1 Parkade Expansion

Alberta Children’s Hospital Lot 1 Parkade Expansion Location: Calgary, AB The Alberta Children’s Hospital Lot 1 Parkade Expansion consisted of a two-level parking deck addition (totaling 173,000 square feet and 503 stalls) on top of an existing three-level parkade....