Fort Hills Secondary Extraction Deep Underground Piping

Fort Hills Secondary Extraction Deep Underground Piping Location: Fort McMurray, AB As part of the Suncor Fort Hills Oil Sands Mine Project, Graham was engaged in the early tailings and secondary extraction system construction programs. Utilizing our large-scale...

Base Mine Dam

Base Mine Dam Location: Fort McMurray, AB The Base Mine Dam project included the construction of an earth dam and sand chimney, manholes, pipeline corridors, haul and access roads, Highway 63 and Underpass Relocation, surface water management system, sumps and the...

Castle Rock Ridge Wind Power Project

Castle Rock Ridge Wind Power Project Location: Pincher Creek, AB The 76 MW Castle Rock Wind Power Plant consisted of 33 Enercon E-70 (2.3 kW) turbines plus access roads, underground collectors, foundations, and substation construction. The access road scope included...

Raleigh Wind Power Project

Raleigh Wind Power Project Location: Merlin, ON This design-build EPC project consisted of a 78MW wind power project with 52 GE 1.5xle turbines. Graham’s scope of work included 24km (15 miles) of permanent access roads, UG and OH collectors, foundations, erection of...

Adelaide Wind Power Project

Adelaide Wind Power Project Location: Strathroy, ON The Adelaide Wind Power Project is a 40MW wind power facility that was constructed near Strathroy Ontario as part of the Ontario Power Authority’s Feed-in Tariff Program. The project consisted of 18 – Siemens 2.3MW...