Spokane Office

Building Across Spokane and the Inland Northwest

Graham’s Spokane office has built a strong reputation throughout the Inland Northwest as a trusted General Contractor, Construction Manager, and Design-Build partner. Our team delivers projects across a broad range of sectors, including education, healthcare, aviation, multi-family residential, commercial, and municipal infrastructure.

We are proud to support Washington State University (WSU) with numerous projects that have advanced its campus and student life, including the Olympia Avenue Student Residence, the Academic Center, the Intercollegiate Center for Nursing, Martin Stadium expansion, and the Biomedical and Health Sciences facility. Most recently, Graham was awarded the Indigenous Health Simulation Center at WSU’s Spokane campus, a cutting-edge facility that will serve the next generation of healthcare providers. Beyond higher education, our work includes K–12 learning environments such as Highland Middle School in Bellevue, and residential developments like the Schmidt Apartments, a historic adaptive reuse that preserved the character of the original building while providing modern living spaces.

As active members of the Washington and Inland Northwest chapters of the Associated General Contractors of America (AGC) and the Design-Build Institute of America (DBIA), we are committed to advancing industry excellence. We are also proud members of the Greater Spokane Valley and West Plains Chambers of Commerce and actively support local initiatives such as food banks and community development programs.

Let’s Build Something Together

Looking to start your next project in Spokane or across the Inland Northwest? Contact our Spokane team today and discover how Graham can bring your vision to life.

Schmidt-Apartments-Spokane-Graham-Construction-Spokane-2

Schmidt Apartments – Spokane, WA

The Schmidt Apartments redevelopment transformed a historic early-1900s building into modern urban lofts while preserving its architectural character. Working with a private developer, Graham delivered an adaptive reuse that integrates new operating systems and exposed brick details. The project includes a street-level restaurant, enhancing downtown vibrancy.

Contact Us to Get Started

Graham, Spokane Office
12439 E. Pinecroft Way #102
Spokane Valley, WA 99216

Phone: 509.534.1030

Our Regional Leadership

Trevor Graafstra

General Manager – Buildings Northwest

Bret Miche

Operations Manager

Key Market Sectors

Airports, Seaports & Export Facilities
Education
Hospitals & Healthcare
Light Industrial
Multi-Family Residential
Recreation/Community Centres, Hotels & Casinos
Stuart-Lake-Hospital-Medical-Facility-Graham-Construction

Highland Middle School – Spokane, WA

What Clients Are Saying

“Our multi-year hospital project with Graham allowed us to work closely with their qualified staff. Graham took the time to ensure that work was done properly and now, six years later and for many more to come, we are very thankful for the quality work.”

Rosalinda Kirby
Administrator
Columbia Basin Hospital

“Graham has been a great partner for Summit Pacific. The team took time to understand our vision, working closely with us to ensure our needs were met throughout design and construction. Ultimately, they built a quality facility for us – on time and on budget.”

Josh Martin
CEO
Summit Pacific Medical Center

“Lastly, kudos and thanks to our talented consultants as they have once again made for a very successful project, to Graham’s team for doing the same and being a pleasure to work with!!Thank you all for your efforts. I told Graham this morning that I wish all the projects I am a part of went so well and had this ‘A’ team!”

Mike Wallace
AIA
Bernardo/Willis Architects

“There were a number of surprises, things we found after the work started, that Graham was flexible and creative in resolving, teaming with the owner and the architect to find the best solution when unknown conditions arose during the job.

I think this project is an excellent example of Graham’s ability to phase the work to maintain existing operations in the same footprint while building a new facility.”

Teresa Foster Eckard
Project Manager
Spokane International Airport

Contact Us

"*" indicates required fields

Name*