Keephills 3 Power – Site Prep Location: Keephills, AB The Site Preparation project included the demolition of existing foundations and buildings, mass excavation for the Power Island Foundation, common fill and granular placement required for site grading, site...
Rosthern School Location: Rosthern, SK This project entailed the construction of a new K-12 community school in Rosthern, SK. The new school replaced the existing elementary and high schools in the town, both of which were approximately 70 years old. Amalgamating the...
Evergreen Light Rail Transit Location: Burnaby, BC Construction of the 11km Evergreen Light Rail Transit project consisted of an extension to the existing Sky Train system which directly links to the Millennium Line with connections to the Expo Line, Canada Line and...
Mosaic Esterhazy Overland Conveyor K3 to K2 Location: Esterhazy, SK Graham was awarded the contract to construct the Overland Belt Conveyor system to transport raw potash between the newly developed mine site at Mosaic K3 to existing mill facilities at the K2 mine...
George Freeman School and Field House Location: Strathmore, AB George Freeman School and the Strathmore Motor Products Sports Centre were developed through an IPD-like process to determine the best design and methods of delivery. Features of our approach included Big...