Gilead API Process Tower Location: Edmonton, AB Graham was selected in 2016 to construct a new Active Pharmaceutical Ingredient (API) Process Tower, which will provide Gilead with additional manufacturing capability for investigational drugs for clinical research...
Castle Rock Ridge Wind Power Project Location: Pincher Creek, AB The 76 MW Castle Rock Wind Power Plant consisted of 33 Enercon E-70 (2.3 kW) turbines plus access roads, underground collectors, foundations, and substation construction. The access road scope included...
Raleigh Wind Power Project Location: Merlin, ON This design-build EPC project consisted of a 78MW wind power project with 52 GE 1.5xle turbines. Graham’s scope of work included 24km (15 miles) of permanent access roads, UG and OH collectors, foundations, erection of...
Adelaide Wind Power Project Location: Strathroy, ON The Adelaide Wind Power Project is a 40MW wind power facility that was constructed near Strathroy Ontario as part of the Ontario Power Authority’s Feed-in Tariff Program. The project consisted of 18 – Siemens 2.3MW...