Bridge over Marsh River

Bridge overMarsh River Location: Morris, MB This project involved the construction of a new three-span steel I-girder bridge over Marsh River, and new realigned road embankments on PTH 23 in the Municipality of Morris, Manitoba. The road embankment involved modified...

Empty Cup Coffee Collective

Empty Cup Coffee Collective Location: Winnipeg, MB Empty Cup Coffee Collective is a locally-owned coffee company featuring an in-house roasting process. The project involved the re-purposing of an existing space to be used as the home of the new café. One of the key...

LRT Crossings Work

LRT Crossings Work Location: Edmonton, AB Graham was awarded the Construction Manager role for upgrades and improvements to LRT Crossings throughout the City of Edmonton as part of a City of Edmonton Call Up portfolio in 2019. The project was originally awarded as two...

Club Regent Casino Parkade

Club Regent Casino Parkade Location: Winnipeg, MB The Club Regent Casino parkade is a 5-storey, 900-vehicle pre-cast concrete parking structure with access to the hotel via a structural steel walkway. The parkade includes three electric traction elevators and four...

Raleigh Wind Power Project

Raleigh Wind Power Project Location: Merlin, ON This design-build EPC project consisted of a 78MW wind power project with 52 GE 1.5xle turbines. Graham’s scope of work included 24km (15 miles) of permanent access roads, UG and OH collectors, foundations, erection of...