Cameron Community Centre and Library Location: Burnaby, BC Graham is providing Construction Management services for the Cameron Community Centre and Library project, located in Burnaby, BC. This 213,000 sq. ft. facility will serve as the civic heart of the Lougheed...
Thank you to all our employees who participated in this year’s Steps for Life walks that took place across Canada from April 30 – May 6. This year, walks took place in-person and virtually (meaning employees walked in their own neighbourhoods). Sixty Graham...
We are pleased to share our 2022 Sustainability Report. Graham continues to be an industry leader as we focus on three strategic areas: Environmental, Social and Governance (ESG). It is embedded in all that we do. Driven by our values of commitment, integrity and...
Castle Rock Ridge Wind Power Project Location: Pincher Creek, AB The 76 MW Castle Rock Wind Power Plant consisted of 33 Enercon E-70 (2.3 kW) turbines plus access roads, underground collectors, foundations, and substation construction. The access road scope included...
Raleigh Wind Power Project Location: Merlin, ON This design-build EPC project consisted of a 78MW wind power project with 52 GE 1.5xle turbines. Graham’s scope of work included 24km (15 miles) of permanent access roads, UG and OH collectors, foundations, erection of...